Projects
Bauer Technologies has delivered a wide range of geotechnical solutions, for projects across the UK. We’ve experience in all key sectors, including energy; rail; highways; and commercial developments.
A selection of our project case studies can be viewed below.
Bauer Technologies executed foundation work for the Wednesbury to Brierley Hill Metro extension, which will enhance public transportation in the Black Country.
Bauer Technologies undertook the piling and foundation works for the project South Bank Quay Teesside, part of the Teesworks Freeport.
Bauer Technologies executed the foundation works for Rivenhall Integrated Waste Management Facility – a pioneering project.
Bauer Technologies designed and installed CFA piles, to act as bearing piles, and a contiguous piled wall for Plot 9A development of the First Street project.
Bauer Technologies completed soil improvement for the Gateshead Quays arena: drilling, grouting, and stabilizing challenging coal measures.
Bauer Technologies constructed piles in such a way that traffic on the A465 was not interrupted for A465 Heads of the Valleys.
Bauer Technologies undertook piling work on both sides of the motorway and central reservation for A533 Chester Road Bridge Replacement.
Bauer Technologies stabilised historic granular and cohesive embankment fill material, to minimise settlements under the planned Delta Junction approach ramp.
Bauer Technologies is providing expert piling and foundation work for the prestigious Audley Square Redevelopment in London’s exclusive Mayfair neighborhood.
Bauer Technologies installed a secant piled shaft required for the overground shaft equipment for Lockwood Beck – Woodsmith Project.
Bauer Technologies provided piling and foundation work for Network Rail’s Werrington Grade Separation, increasing capacity and efficiency on the East Coast Main Line.
Bauer Technologies is delivering piling and foundation work for the M6 Junction 19 Improvement Scheme, enhancing traffic flow between Cheshire and South Manchester.
Do you have any questions?
To discuss your project geotechnical requirements, please contact our team.
10 Ducketts Wharf
South Street
Bishops Stortford
Hertfordshire
CM23 3AR United Kingdom