Foundation work for A533 Chester Road Bridge Replacement

New foundations for 120 years of connection

The M56/A533 Expressway Bridge, constructed in 1971, had come to the end of its serviceable life and needed replacing. The new structure ensures a life span of over 120 years and maintains safety in both the short and long term. The bridge – situated between junctions 11 & 12 of the M56 – is a vital local link, providing access across the M56 to Runcorn from Preston Brook & Northwich. The replacement was a new 67 m, two-span concrete bridge, including a single two-lane carriageway and a combined footpath/cycleway.

Facts about the project
Company :

BAUER Technologies Limited

Location :

Cheshire

Project name :

A533 Chester Road Bridge Replacement

Client :

National Highways

Period :

March 2022 to April 2022

Services :

Rotary bored bearing piles, rotary bored piles

Publication :

Do you have any questions?

To discuss your project geotechnical requirements, please contact our team. 

BAUER Technologies Ltd.

10 Ducketts Wharf
South Street
Bishops Stortford
Hertfordshire
CM23 3AR United Kingdom