Foundation work for Lockwood Beck
Located in Whitby, North Yorkshire, Woodsmith Mine is set to be the UK’s deepest mine and will see large quantities of polyhalite mined for global distribution. As part of the ongoing mine development, Bauer Technolgies was appointed by tunnelling contractor, STRABAG International, to install a secant piled shaft, together with the bearing/tension piles required for the overground shaft equipment. Our scope of work was carried out over two separate visits, between October 2020 and January 2021. The first saw we installed the secant piled shaft: 30 nr x 900 mm bored piles were installed to 25 m deep through mudstones, to form a new access shaft to the material transport tunnel.
BAUER Technologies Limited
North Yorkshire
Lockwood Beck, Woodsmith Project
October 2020 (one week) and January 2021 (one week)
Do you have any questions?
To discuss your project geotechnical requirements, please contact our team.
10 Ducketts Wharf
South Street
Bishops Stortford
Hertfordshire
CM23 3AR United Kingdom