Bauer Technologies specialises in the removal of existing concrete piles, including the utilisation of a bespoke annulus cutter system that debonds and removes material around existing piles, allowing the complete pile to be lifted out of the ground in sections. In addition to the cutter system, Bauer can utilise a destructive pile / obstruction removal system. Bauer has successfully removed piles up to 35m deep at a diameter of 1350mm as well as the removal of piles with permanent steel liners.