Mixed-in-Place

The Mixed-in-Place (MIP) method is particularly suitable in non-cohesive soils for the construction of cut-off walls as groundwater or pollution control, for remediating dykes and dams, or for the installation of structural retaining walls to secure terraces in the ground and excavations.  In the MIP method, the surrounding soil is broken up with a single or triple auger, turned over and the pores filled in with binder suspension. The individual units are combined to form walls by the step back method.  BAUER can also adopt the MIP method by utilising Cutters.

Media

Further interesting information