Bauer Technologies was awarded the contract to undertake the piling and diaphragm walling works for the new US Embassy in London. The US Department of State Bureau of Overseas Buildings Operations (OBO), construction contractor, BL Harbert, and prime sub-contractor, Sir Robert McAlpine, selected Bauer Technologies for the early site work package.
Bauer’s work consisted of the construction of a diaphragm wall; deep, base-grouted, large diameter rotary bored piles; CFA and rotary bored piles
The project commenced with preliminary test piling in June 2013, ahead of the main works which started in August 2013.
BAUER Technologies Ltd
10 Ducketts Wharf
South Street
Bishops Stortford
Hertfordshire
CM23 3AR
United Kingdom
© All Rights Reserved